Nov
18
2018
Chance of Rain
Sunday
High 50° / Low 34°
Chance of Rain
Monday
High 40° / Low 31°
From the Print
A “cold asphalt planer,” operated by John Morris of Jurgensen Construction, stripped away the top layer of asphalt to prepare the surface for new blacktop. The machines were at once sophisticated high-tech and awesome claw-bearing behemoths. (Photo by Matt Minde)

A “cold asphalt planer,” operated by John Morris of Jurgensen Construction, stripped away the top layer of asphalt to prepare the surface for new blacktop. The machines were at once sophisticated high-tech and awesome claw-bearing behemoths. (Photo by Matt Minde)

Yearly grind

Print Friendly, PDF & Email

Kieth’s Alley got a much-needed resurfacing this week during the village’s annual paving of local streets. Here, a “cold asphalt planer,” operated by John Morris of Jurgensen Construction, stripped away the top layer of asphalt to prepare the surface for new blacktop. The machines were at once sophisticated high-tech and awesome claw-bearing behemoths.

Topics: , ,

No comments yet for this article.

%d bloggers like this: