Request for bids
- Published: July 23, 2014
REQUEST FOR BIDS
VILLAGE OF YELLOW SPRINGS
SIDEWALK REHABILITATION – STREETSCAPE
1.1 SEALED BIDS will be received by the Village of Yellow Springs, Ohio until 11:00 a.m., (local time) on Friday, August 22, 2014 at the Office of the Village Manager, 100 Dayton Street, 2nd Floor, Yellow Springs, Ohio 45387, and publicly opened and read at that hour and place.
1.2 SCOPE OF WORK to be performed under this contract shall consist of the excavation of existing sidewalk concrete from Glen Street to the southern edge of the Dino’s Cafe; removal of 8 trees/stumps (installation of 8 new trees – supplied by Village); pour new concrete sidewalks curb to wall (4” thick and 5’ X 5’ sections. All concrete work shall be with 4500 psi, air-entrained to 6%, and a maximum water cement ratio of 0.45). Painting provided by contractor. Excavation service will include related connections and repairs and excavation for the burying of conduit.
1.3 The Village of Yellow Springs reserves the right to reject any or all bids in accordance with the Contract Documents. The Village of Yellow Springs reserves the right to add to or to subtract from the contract quantities. The Village of Yellow Springs also reserves the right to hold all proposals for sixty (60) days. For further information and a complete copy of the RFB packet, contact Jason Hamby at (937) 767-6633.
1.4 EACH BIDDER is required to furnish with its proposal, a Bid Guaranty (10% of the Bid Amount) and Contract Bond (100% of the Bid Amount) in accordance with Section 153.54 of the Ohio Revised Code.
1.5BIDDERS must comply with the prevailing wage rates on Public Improvements in Greene County and the Village of Yellow Springs as determined by the Ohio Bureau of Employment Services, Wage and Hour Division, (614) 644-2239.
1.6Two (2) complete sets of BID documents shall be enclosed in a sealed envelope identified as “VILLAGE OF YELLOW SPRINGS SIDEWALK REHABILITATION – STREETSCAPE” and MUST HAVE THE FULL NAME AND ADDRESS of the bidder on the envelope.
1.7All work to be completed and materials removed by October 4th, 2014.
Comments are closed for this article.